Leisure cost of electric power failures
Material type:
- "X 9(D66).1(X).N7, L8/UN"
Item type | Current library | Home library | Call number | Status | Barcode | |
---|---|---|---|---|---|---|
![]() |
Ratan Tata Library | Ratan Tata Library | "X 9(D66).1(X).N7 L8/UN" (Browse shelf(Opens below)) | Not for loan | RT0577588 |
Browsing Ratan Tata Library shelves Close shelf browser (Hides shelf browser)
X9(D65):9J2.2 P7 Global body shopping An Indian labour system in the information technology industry. | X9(D66.1).2.N7 N7 Cogeneration Policies potential and tehnologies | X9(D66 122).2.N87 - N86r M7/GD Annual Report 1986-87. | "X 9(D66).1(X).N7 L8/UN" Leisure cost of electric power failures | X9(D66).1(X).N8 M7 Rural electrification for development Policy anal | X9(D66).1(X).N8 M8 Electric power for rural growth How electricity a | "X 9(D66).1(X).N9 N3/UN" Power generation options |
"World Bank Staff, working paper, 285; International Bank for Reconstruction and Development, publication"
There are no comments on this title.
Log in to your account to post a comment.